Joined
·
15,926 Posts
I made it into Jamaica Beach this morning. There were power crews from Georgia swarming all over JB putting in new poles, stringing lines, replacing transformers, etc.
I talked to one of the guys that stopped to inspect a tranformer and he thought they would be done in JB by Wednesday at the latest.
The new poles they put in along 3005 after Rita, looked good, soooo... soon I think.
I talked to one of the guys that stopped to inspect a tranformer and he thought they would be done in JB by Wednesday at the latest.
The new poles they put in along 3005 after Rita, looked good, soooo... soon I think.