Here it is! 99.2% done, need door on shower. About 4 full weekends at a cost of 5500.00
Anyone have an idea how much this would have cost to contract out? It is a 12x16 deck on top with a 85' pier and a 16x20 deck over the water.
If pic don't show I can e mail to someone who is not a speed-bump on the information superhwy.
__________________