2 Cool Fishing Forum banner
1 - 14 of 14 Posts

·
Boatright custom flats
Joined
·
3,826 Posts
Discussion Starter · #1 ·
Pretty much devastated. Wonder how long it could possible take to rebuild that? I heard a rumor it could take over a year and several million dollars. What do ya'll think?
 

Attachments

·
COME AND TAKE IT
Joined
·
11,395 Posts
will take more then a couple of million, and just the impact studies will take more then a year to get done. They may be able to put some rock down for temp use. But for a true fix it will take a long time, unless polticians push it through and get a bid package out fast.
 

·
Say "when"
Joined
·
7,266 Posts
Maybe not too bad

These aerial images look pretty similar to the highway running down the Bolivar Peninsula. Looked like the highway had just washed away repeatedly in big chunks. But apparently (I drove the entire Bolivar highway from HI to PB Saturday) what looked like wash outs from the air were actually washed over. So they just graded off the sand and the road was still in tact and then they patched up some small number of spots on the highway. This is just ignorant comparison of course, but maybe (hopefully) the same thing happened on the BWH. Long range of course large portions of both highways will have to be re done, elevated, moved inland, etc.
 

·
Registered
Joined
·
10,844 Posts
Blue water Hwy. is the only route South out of Galveston. Guess we'll be taking 2004 through Alta Loma instead.
I guess the toll bridge guys will need to find a new job!
 
1 - 14 of 14 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top