2 Cool Fishing Forum banner
1 - 1 of 1 Posts

·
Fat boy fresh
Joined
·
2,041 Posts
Discussion Starter · #1 ·
Anybody that uses 288 north or south it looks like the state, county, or whoever comes up with the brain farts had a really bright idea. They have the freeway shut down to 2 lanes (about halfway between 610 and beltway) during rushhour so they can do work, it looks like they're gonna widen it but i can't really tell. it'll be nice when it's done if thats what their doin but give us a break, why can't they do it at night and on the weekends. It took 35 minutes to get from 610 to the NHCC college campus. Does anybody out there know if they are widening it, or just working on the bridge? by the way, it doesn't look like it's gonna be a 1 or 2 day deal either.
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top